Austin Leitko
Northwinds Construction
"I'd say using GatorBar took 50% of the labor out of the rebar placement portion of the project, and reduced the install time by 25%."
Barn stem wallContractor: Hendrixson Concrete Project Owner: Specification: Stem wall with #3 GatorBar horizontals Location: IN |
Little League Baseball Backstop wallContractor: Hendrixson Concrete Project Owner: Specification: Backstop wall with #3 GatorBar horizontals Location: Vincennes, IN |
concrete block masonry buildingContractor: Project Owner: Spherical Block Specification: #3 GatorBar reinforced masonry walls and roof Location: Alfred Station, NY |
![]() Halls Bayou Hike & Bike TrailContractor: Project Owner: City of Houston Specification: #3 GatorBar 12'' OCBW Location: Houston, TX |
Austin Leitko
Northwinds Construction
"I'd say using GatorBar took 50% of the labor out of the rebar placement portion of the project, and reduced the install time by 25%."
4